1.Preparation for lifting with container loader: The lifting strap is 4 meters at the small platform and 6 meters at the large platform; the lifting points need to be installed when lifting on both sides of the large platform, and need to be removed after loading and unloading.
The picture shows the hook placed in the vehicle accessories, and the loading and unloading lifting points are as follows.
2.Platform installation: 4 people are required to lift the workbench and place it on the forklift. Note that the forklift should enter after the workbench is lifted to avoid hitting the cylinder. Move the forklift after the workbench is stable, lower the workbench to the corresponding platform installation hole, and tighten the 8 screws.
After the workbench screws are tightened, the wiring harness and plug-ins at the bottom are reset according to color.
Mobile board installation: The picture shows the departure status.
The large and small platform installation:
Ladder installation:
Note: When loading, follow the above process in reverse to disassemble, and the lifting points on both sides of the large platform must be installed face to face.